After-Construction Deep Cleaning Service

Ho Chi Minh City after-construction cleaning for new builds, fit-outs, and major renovations. Deep cleanup of fine dust, debris, paint, and adhesive residue from floors, walls, fixtures, and HVAC vents so the space is move-in ready.

₫850,000.00  Starting price for 1 bedroom / 1 bathroom or studio

Expat Friendly. Quick response. Always on time. 100% Guarantee.

← Part of Deep Cleaning
★★★★★ What our customers say
Jiang Susan
Jiang Susan
a month ago
★★★★★

Mold cleaning for the whole apartment, very fast and kind. Clean all walls, ceilings, mattresses and carpets. Good enough.

Vivian Hoang
Vivian Hoang
a month ago
★★★★★

I had my apartment deep cleaned before moving in. I was very happy with their service. Very quick to reply. Cleaners were punctual and kept good communication with me too. Would highly recommend

Iliass
Iliass
a month ago
★★★★★

Great cleaning service that has excellent communication and works fast. They could arrange a deep cleaning for me within 2 days and the service was great. Apartment was thoroughly cleaned and we were satisfied.

Why Construction Cleanup Is Not a DIY Job

Handover cleans and post-fit-out cleans are constant work in this city, where whole towers in Thu Duc and District 7 hand over floor by floor. You just spent weeks or months on a renovation. The temptation to save money by cleaning up yourself is understandable. Here is why that almost never works out the way you expect.

The Dust Problem

Construction dust is not like household dust. It contains particles of concrete,ite, silica, and whatever materials were cut, drilled, or sanded during your project. These particles are extremely fine, measuring 2.5 to 10 microns. A regular household vacuum does not filter particles this small. It picks them up from the floor and blows them back into the air through its exhaust. You vacuum a room, and within an hour, a new layer of dust has settled on every surface. A HEPA-filtered vacuum captures particles down to 0.3 microns, which is why professional post-construction cleaning uses HEPA equipment exclusively.

The Time Factor

Most people underestimate the time required by a factor of three to five. A two-bedroom condo after a kitchen renovation typically takes a professional team 6 to 8 hours. Doing it yourself, without commercial equipment, takes two to three full days of effort. Every cabinet must be opened, wiped inside, and closed. Every window track must be brushed out. Every surface must be wiped, often multiple times, because the fine dust keeps resettling.

The Invisible Contamination

Construction dust travels through air currents to rooms that were not part of the renovation. It enters AC ducts and sits on evaporator coils. It settles inside closed cabinets and drawers. It coats the inside of light fixtures. A surface wipe of visible areas misses these hidden deposits, which continue releasing particles into your air for weeks.

What Professional After-Construction Cleaning Covers

The scope goes far beyond what a person with a mop and bucket can accomplish:

Surface Decontamination

Every surface in every room is cleaned, starting from the ceiling and working down. This includes the insides of all cabinets, closets, and drawers. Light fixtures are opened, cleaned, and closed. Switch plates are removed, the wall behind them is wiped, and they are replaced. This level of detail eliminates the hidden dust deposits that casual cleaning misses.

Adhesive and Residue Removal

Contractors leave behind tape residue, dried paint drops, grout haze on new tiles, silicone smears around fixtures, and label adhesive on new appliances. Each type of residue requires a specific removal technique to avoid damaging the underlying surface. Scraping dried paint off a new floor with the wrong tool creates scratches that are permanent.

Window and Glass Cleaning

Windows are usually the dirtiest item after construction. Cement splatter, paint spots, tape adhesive, and a heavy dust film must all be removed without scratching the glass. Interior and exterior surfaces are cleaned, along with tracks and frames that are typically packed with construction debris.

Air System Cleaning

AC vent covers are removed and cleaned. Accessible filters are vacuumed or replaced. This step is critical because running your AC without cleaning the system first circulates construction dust through every room every time the unit turns on.

When to Schedule

Wait until all construction, painting, tiling, and finishing work is 100% complete. Every additional day of work after a clean means another layer of dust. The clean should be the final step before furniture delivery and move-in. If the renovation was extensive (structural changes, full floor replacement, extensive sanding), consider a second light clean 48 hours after the first to catch resettled particles.

More Deep Cleaning services

Post-Renovation Deep Cleaning Service

After-Party Deep Cleaning Service

Barbeque Cleaning Service

Appliance Deep Cleaning Service

Bathroom Deep Cleaning Service

Ceiling & Wall Deep Cleaning Service

Floor Stripping and Waxing Service

COVID-19 Disinfection Service

Garage Deep Cleaning Service

Hood Cleaning Service

Grease Trap Cleaning Service

Mold Removal and Prevention Service

Kitchen Deep Cleaning Service

Move-Out Deep Cleaning Service

One-Time Deep Cleaning Service

Move-In Deep Cleaning Service

Sanitizing & Disinfecting Service

Restaurant Kitchen Deep Cleaning Service

Retail Store Deep Cleaning Service

Stove Cleaning Service

Spring Cleaning Service

Tile & Grout Deep Cleaning Service

Order Cleaning
Get the Price Now
After-Construction Deep Cleaning Service
HCM Cleaning, P.702A Tầng 7, Tòa nhà Centre Point, 106 Nguyễn Văn Trỗi, Phường 08, Quận Phú Nhuận, Thành phố Hồ Chí Minh, Việt Nam